Sign In | Join Free | My enlightcorp.com
China Henan Dowell Crane Co., Ltd. logo
Henan Dowell Crane Co., Ltd.
To Seek the speed, chase the efficiency, guarantee the quality!
Active Member

7 Years

Home > Launcher Crane >

Bridge Erecting Launching Crane , 200T Double Girder Gantry Crane

Henan Dowell Crane Co., Ltd.
Contact Now

Bridge Erecting Launching Crane , 200T Double Girder Gantry Crane

Brand Name : Dowellcrane

Model Number : JQJ

Certification : SGS IOS CE

Place of Origin : China (Mainland)

MOQ : 1

Price : USD100000-700000/set

Supply Ability : 2000sets per year

Delivery Time : 60days

Packaging Details : wooden case for electric parts, other naked

Product name : 200 ton Bridge Erecting Launching Double Girder Gantry Crane

Application : high speed railway

Condition : New

Warranty : 2 Years

After-sales service provided : Engineers available to service machinery overseas,Field installation

Rated Loading Capacity : 20-900ton

Color : Customer Request

Max. Lifting Load : 20-900t

Contact Now

200 ton Bridge Erecting Launching Double Girder Gantry Crane


Description:

200 ton Bridge Erecting Launching Double Girder Gantry Crane applies to highway, railway bridges to the construction site of bridge construction, its main function is to mention prefabricated good beam slice and delivered on prefabricated good piers.it and general meaning cranes have very big different, high safety requirements.
The capacity: 60-200ton
The span : 20-50m
Control Mode: Pendant, Remote Control and Cabin Control.

Technical parameters of bridge girder Launcher:

MCJH50/200
MCJH40/160
MCJH40/160
MCJH35/100
MCJH30/100
Lifting capacity
200t
160t
120t
100t
100t
applicable span
≤55m
≤50m
≤40m
≤35m
≤30m
applicable skew bridge angle
0-450
0-450
0-450
0-450
0-450
trolley lifting speed
0.8m/min
0.8m/min
0.8m/min
1.27m/min
0.8m/min
rolley longitudinal moving speed
4.25m/min
4.25m/min
4.25m/min
4.25m/min
4.25m/min
cart longitudinal moving speed
4.25m/min
4.25m/min
4.25m/min
4.25m/min
4.25m/min
cart transverse moving speed
2.45m/min
2.45m/min
2.45m/min
2.45m/min
2.45m/min
transportation capacity of bridge transport vehicle
100t X2
80t X2
60t X2
50t X2
50t X2
heavy load speed of bridge transport vehicle
8.5m/min
8.5m/min
8.5m/min
8.5m/min
8.5m/min
bridge transport vehicle return speed
17m/min
17m/min
17m/min
17m/min
17m/min


Drawing of Bridge Erecting Launching Crane:

Bridge Erecting Launching Crane , 200T Double Girder Gantry Crane
About Us

Dowellcrane Machinery Group is a China-leading group of crane businesses which was founded in 1955, Only one company has 60years manufacture experience. And serving a broad range of customers all over the world to provide a complete set of advanced lifting project, including Gantry crane, Bridge crane, Jib crane, Accessory. Our clients include manufacturing and process industries, shipyards, ports and so on. Regardless of your lifting needs, dowellcrane Machinery Group is committed to providing you with lifting equipment and services that increase the effectiveness and value of your business.

  1. Dowellcrane Machinery Group have already obtained the CCC,CE,BV,SGS,ISO OHSAS certification's and have won over 60 honors.
  2. China's leading mechanical research and design institute and famous university provides advanced technical support for us.
  3. Serviced for more than 5000 companies, and the products popular in more than 40 countries.
  4. Through decades of unremitting efforts, now, dowellcrane Machinery Group covers an area of 180,000 square meters and over 380 sets of advanced equipments. Management staff reach to 860, and our worker have more than 10000.


Our Services

  1. We have a professional sales team,can privede u a quick and professional reply.
  2. Exclusive engineer support at any time, so we can design within 24 hours.
  3. 2 year warranty for whole machines, providing all parts free of charge.
  4. Low charge for continue maintenance when warranty is expired.
  5. Can produce the largest tonnage crane,just give us your demand.
  6. We can provide free training to end-users, don't worry about the installation.


Packing and Delivery

Bridge Erecting Launching Crane , 200T Double Girder Gantry Crane

Packing methods:
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

Delivery methods:
1. If the size of 150 ton concrete T beam launcher are suitable for container ship, usually by container;
2. If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

Delivery time:
Within 30 to 40 working days after the receipt of deposit.
Transportation:

generally 35 days to 50 days to destination port.




































Product Tags:

industrial crane

      

launching lifting equipment

      
Quality Bridge Erecting Launching Crane , 200T Double Girder Gantry Crane for sale

Bridge Erecting Launching Crane , 200T Double Girder Gantry Crane Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Henan Dowell Crane Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)